Solar
Pile foundation drilling solutions for utility-scale solar parks, renewable energy projects and photovoltaic installations.
Understanding the Application
Solar infrastructure drilling involves creating large numbers of foundation holes for photovoltaic structures. Productivity, consistent hole dimensions, ground adaptability and machine mobility are important considerations for large solar projects.
Geological Conditions
Challenges in Solar
These are the main drilling conditions that should be considered when planning equipment for this application.
Large number of repetitive holes
Variable ground conditions
Required foundation depth
Consistent hole diameter
High daily productivity
Site mobility and positioning
What the Rig Needs
The drilling rig should be configured around the actual demands of the application and ground conditions.
Fast and controlled feed
Reliable rotary or DTH capability
Suitable piling depth
Efficient positioning
Reliable hydraulic system
High operational productivity
Need the Right Rig for Your Project?
Share your project requirements with our team and we can help you identify a suitable NGE drilling rig.
Discuss Your Project